Lab One Hospital - Kashimpur
Home Projects Lab One Hospital
Ongoing Project

Lab One Hospital - Kashimpur

HVAC system supply and implementation for Lab One Hospital, currently in the pre-execution phase with procurement underway through an established Letter of Credit and installation planned to begin upon equipment arrival.

📍 Tetuibari, DEPZ Road, Mojarmil Bus Stand, Kashimpur, Bangladesh
Project Overview

About this project

Shaheen Enterprises has been awarded the HVAC system supply and implementation contract for Lab One Hospital, marking another significant milestone in delivering advanced climate control solutions for healthcare facilities. The project is designed to deliver a high-performance, energy-efficient, and healthcare-compliant HVAC system that supports optimal indoor environmental conditions for hospital operations. The total project capacity is planned at 1,000 TR across new and existing facilities, with the first phase implementing approximately 600 TR for the new hospital project and the remaining 400 TR planned for replacement of the existing hospital's VRF system with air-cooled water chillers.

Highlights

  • 1,000 TR total planned project capacity across new and existing hospital facilities
  • First phase planned at approximately 600 TR for the new hospital project
  • Remaining 400 TR planned for replacement of the existing VRF system with air-cooled water chillers
  • HVAC Sales Contract awarded and procurement underway through an established Letter of Credit
  • Equipment ready for shipment with installation planned to begin upon arrival at site
  • Planned system includes AHU and duct-type FCU, cassette-type FCU, chilled water pumps, and PLC pump control cabinet with VFD

Project Status

The HVAC sales contract has been awarded, procurement is underway through an established Letter of Credit, equipment delivery is in progress, and the execution phase is pending with installation to begin upon arrival at site.

Proposed System Configuration

The proposed configuration includes one 200 TR air-cooled water chiller in the current listed scope, 30 sets of AHU and duct-type FCU units of different capacities, 50 sets of cassette-type FCU units of different capacities, four sets of internal and external chilled water pumps, and one PLC control cabinet for pumps with VFD.

Project Objectives

The primary objective is to design and implement a robust HVAC system that ensures continuous and reliable temperature control, compliance with healthcare ventilation standards, energy-efficient performance, scalable infrastructure for future expansion, and operational reliability for 24/7 hospital services.

Engineering Design & Planning

Shaheen Enterprises' scope includes cooling load analysis and zoning strategy, system design and configuration planning, equipment selection and optimization, and compliance with healthcare HVAC standards.

Procurement & Supply Chain

HVAC equipment is being procured through LC from Shaheen Enterprises' reliable partner manufacturer H.Stars Group, with coordination, quality assurance, logistics planning, and delivery scheduling.

Installation & Execution Strategy

A fast-track execution model has been adopted to minimize delay between equipment delivery and installation. Dedicated engineering and technical teams from Shaheen Enterprises will support rapid deployment, site readiness, installation planning, coordination with MEP and civil teams, quality control, and safety compliance.

Documentation & Project Management

The project scope includes technical documentation and reporting, project scheduling and progress tracking, and compliance and handover documentation.

Maintenance & After-Sales Support

Planned post-installation support includes a preventive maintenance framework, 24/7 technical support readiness, performance monitoring, and optimization.

Future Outlook

Upon successful completion, this project is expected to stand as a benchmark HVAC implementation in the healthcare sector, reinforcing Shaheen Enterprises' position as a trusted engineering partner for mission-critical environments while delivering long-term operational efficiency, reliability, and sustainability for Lab One Hospital.

Need a similar project solution?

Tell us your requirement and we will help with sourcing, documentation, project coordination, and long-term support.

Request a Quote